Short description:

Developing a new material control system for tracking the material flow from procurement through to the construction site.

Supplement:

The project was divided into the subprojects "Project control", "Procurement", "Shipping" and "Construction site. Other considerations in the project: standardizing the system landscape (including replacing old system and transfer of old data), downsizing (client/server system).