Project ID: 545 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
Integrated planning and control system
Project start/end: 01.06.1993 - 30.06.1994
Short description:
Designing and implementing a system for calculating and tracking costs, from the quotation phase through to production.
Supplement:
Some of the data is copied from host systems (including SAP R/2) and is made available for the planning tasks in an Oracle database (e.g. extrapolation, target-actual comparison).