Project ID: 544 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
Introducing Triton 3.1 for production
Project start/end: 01.04.1995 - 31.03.1997
Short description:
The production department of an extreme job producer is supported by Triton 3.1 for materials management and production planning and control.
Supplement:
Triton PPS replaces old host-based systems for bill of material management and work schedules. Controlling a sawing center with high bay warehouse (Siemens PLC). New program modules are developed for functions that are not available in the standard software; some of these new modules are coupled to the standard functions (e.g. machine utilization -> production planning with a planning board). Examples of these functions include delivery, machine utilization, time recording via bar codes, cross-client rough planning, manufacturing equipment. Inventory and financial commitments.