Project ID: 758 | Branch group: Life Science | Branch: pharmaceutical industry
Inventory management system
Project start/end: 01.07.2000 - 01.01.2001
Short description:
Analysis, design and implementation of the necessary system adjustments to an existing inventory management system that are required due to the move from an SAP R/2 system to an SAP R/3 system.