Project ID: 618 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
Medium-term DP strategy
Project start/end: 01.11.1985 - 15.12.1985
Short description:
Involvement in a project to develop a medium-term data processing strategy for a plant engineering company. The existing infrastructure, which uses individual systems on Wang VS, is to be migrated to host-based standard software systems (SAP R/2).
Supplement:
In addition to replacing the hardware (IBM hosts instead of Wang), plans are also to be drawn up to replace the software with SAP R/2, RF, RK and RM.
Technical description:
The focus is on accounting and particularly cost-unit accounting.