Project ID: 757 | Branch group: Life Science | Branch: pharmaceutical industry
Production control system
Project start/end: 01.02.2002 - 01.04.2002
Short description:
Analysis and implementation of the necessary system adjustments to an existing production control system that are required due to the move from an SAP R/2 system to an SAP R/3 system.