Project ID: 1484 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
Project control system
Project start/end: 01.04.1995 - 31.07.1995
Short description:
Migrating an application from SQL*Forms 3.0 to Oracle Forms 4.5. The system is used to manage project data that occurs in various areas of project handling. Cost units can be defined for each project; these cost units are equipped with a target expenditure trend.
Supplement:
Essential preliminary work for this implementation includes compiling standards for converting a text-oriented interface (SQL*Forms 3.0) to a graphic interface (Oracle Forms 4.5) in Windows 3.x