Project ID: 760 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
SAP R/3 fiscal year change
Project start/end: 01.03.2002 - 30.06.2002
Short description:
Implementing a change from the calendar year to a fiscal year running from April 1 to March 31.
Supplement:
The conversion services are started in cooperation with SAP and the results are evaluated. To ensure quality, the PTA test database is used.
Technical description:
Supporting the logistics area during the conversion. Testing the functions to establish whether they have changed as a result of the conversion. Eliminating any faults that occur. Assisting basic support with troubleshooting.