Project ID: 135 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
SAP R/3 – PDM interface
Project start/end: 01.07.2000 - 31.12.2000
Short description:
Designing and implementing a BAPI interface between R/3 logistics and a product data management system (PDM) in Metaphase.
Supplement:
An interface is created between the R/3 logistical modules and the PDM system Metaphase, in order to transfer material master data and order data by BAPI.