Project ID: 1094 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
SAP R/3 release upgrade from 4.0B to 4.6C
Project start/end: 01.07.2002 - 28.02.2003
Short description:
A release upgrade from SAP R/3 4.0B to SAP R/3 4.6C is carried out in a large enterprise.
Supplement:
The release upgrade is supported systematically from the start. Starting with the PUT on 4.6C, to analyzing the error logs that occur, through to processing SPDD and SPAU.