Project ID: 841 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
Triton project calculation
Project start/end: 01.10.2000 - 31.03.2001
Short description:
Designing and implementing a customer-specific project calculation in Triton 3.1.
Supplement:
The calculation functions available in Triton 3.1 are not sufficient for concurrent calculation in job production; as a result, customized functions are to be developed.