Project ID: 1233 | Branch group: Manufacturing Industry | Branch: mechanical and plant engineering
Y2K conversion of the systems for a production control center
Project start/end: 01.07.1999 - 01.01.2000
Short description:
Structuring a test environment with the software used in the production control center. Testing the Y2K compliance of the software used.