IT project database

Weißes Quadrat mit umrandeten Seiten rechts oben

IT project database: The expert knowledge of our IT consultancy

Convince yourself of the range of our IT consulting services and our unique expertise, which we make transparent for you with our IT project database. With the help of filters and keyword searches, you can search through 4842 IT projects that we have successfully completed with our customers.

The customer is migrating its SAP IS-U system to S/4HANA Utilities in the private cloud. As part of this project, which is part of a comprehensive transformation program, the billing solution is …
The Low Voltage Cockpit (NSC) is a software tool for monitoring and automated control of low voltage networks in accordance with the legal requirements of the Energy Industry Act (EnWG). The aim …
The aim of the project is to design, develop and integrate a scalable B2B solution that enables the automated exchange of business data and transactions between partner companies. The solution should increase …
The backend development department requires external support to ensure ongoing batch operations. The demand originates in a reduction in personnel. Two process automation and batch control specialists from PTA were commissioned. The …
The software to be developed is the so-called Low Voltage Cockpit (NSC). It is a software tool designed for monitoring and automated control of low voltage networks. The NSC is being developed …
The aim is to relieve the central master data application with an independent document repository. The previous document repository only allowed the customer a simple relationship between the functional context and the …
In the IT sub-project (implementation of the EU Corporate Sustainability Reporting Directive), it is to record the existing data flows, architectures and IT systems in the business analysis for all reporting requirements, …
The DevOps team supports the department's development teams by creating and managing automations for the development and deployment of their software and providing the infrastructure. PTA provides personnel to expand the team …
The aim is to set up a transformation process for the automatic processing of existing data deliveries, on the basis of which reports with economic parameters for gas and electricity networks are …
The CSRD sustainability report for 2024 and 2025 required by the EU necessitates the technical definition of KPIs for all specific qualitative and quantitative parameters, such as emissions and CO2 reductions, as …
In order to realize the heat transition propagated by the German government, the customer wants to involve regional tradespeople in the installation of heating solutions in existing and new buildings. To do …
The PTA creates an implementation plan and a requirements specification to clarify the necessary functional extensions for integrating the Grid Failure Information Module (GFI) module into the IT system environment of the …
Adjustments to market communication by the German Association of Energy and Water Industries (BDEW) will result in process adjustments. As a metering point operator, the customer assumes the central role in communication …
The focus of the project is on connecting an external forecasting system for photovoltaic systems. In addition, basic functionalities for managing photovoltaic systems are being implemented within the customer's internal applications for …
The project involves migrating a proprietary software for automating and optimizing the power production planning and short-term power trading process into a new Azure cloud environment. At the same time updating the …
Leads are created in the CRM system via different touchpoints (web, CSV import, manual entry). A sales manager manually assigns these leads to sales employees according to certain rules. The goal of …
The federal government has passed to the relief of the final consumers of natural gas and warmth of law, with which private persons and companies with small to middle consumption are supported …
The 'Bundesverband der Energie- und Wasserwirtschaft (BDEW)' has decided on changes in market communication as of 01.10.2022, which entail comprehensive adjustments in the Edifact processes. These include changes in the electronic data …
The membership of a field service team changes regularly. Therefore, the teams are populated promptly before the assignment. The planning of field service assignments is simplified by the replacement of an Excel …
More and more smart metering systems are being used in metering point operation. These metering devices are equipped with smart meter gateways that handle communication. Metering products are being introduced to harmonise …
The billing system is continuously developed to keep pace with changes in business and technical requirements. PTA has defined the technological implementation and designed the software architecture. For quality assurance, automated tests …
This strategic project (=program) serves to optimize business IT. Here, new IT applications are to be introduced, inefficient IT applications switched off and underlying processes optimized. These necessary adjustments will run through …
The online assistance of the customer application is updated. An inventory of help topics was previously made for the online help. Help topics that do not exist are now being updated. …
An existing intranet application for planning the dismantling of a power plant is extended by various technical optimisations to support the user. Additional automated assignments of standard dismantling measures relieve the processor …

Have we sparked your interest ?

Dr. Frank Gredel, ein Mann mit braunen Haaren

Dr. Frank Gredel

Management Consultant

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.