This is one of 4546 IT projects that we have successfully completed with our customers.

How can we support you?

Integrating additional allocations in an existing settlement system

Project duration: 3 months

Brief description

The project encompasses integrating the requirements of a transmission provider in connection with the annual settlement of the §19(2) allocation into an existing system for settlement of the allocation pursuant to the German Act on Coupling of Heat and Power [KWK Umlage]. In addition, the functions required for allocation settlement during the year are implemented for interruptible loads.

Subject description

Pursuant to §19(2) Strom NEV [German Regulation on Power Grid Access Charges] German transmission providers have been required since 2012 to compensate transmission providers for lost profits in their control zone caused due to reduced transmission fees offered under statute for transmission customers with atypical consumption characteristics. In accordance with the §19(2) allocation, the resulting costs are allocated equally to all transmission providers depending on the power provided to transmission consumers. Since this allocation mechanism is largely equivalent to the allocation mechanism used in the allocation under the German Act on Coupling of Heat and Power [KWKG] that has existed since 2002, the settlement processes can be mapped comparatively straightforwardly in the same settlement system. This applies equally to the allocation charged from 2014 in respect of costs for interruptible loads.

Overview

Project periodProjektzeitraum01.10.2013 - 31.12.2013

Have we sparked your interest?

Dr. Andreas Schneider

Sector Manager Energy

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.