This is one of 4842 IT projects that we have successfully completed with our customers.
How can we support you?

Weißes Quadrat mit umrandeten Seiten rechts oben

Management information system for a large hospital

This IT project is part of our digitalization and optimization of our customers’ IT landscape. Through targeted measures, we promote technological progress, optimize cross-system processes and create a sustainable basis for future developments. Our IT reference projects serve as a basis for orientation. They support the reusability of tried and tested concepts as part of project implementation.

Project duration: 5 months

Brief description

SAP Lumira is used to create a management information system with KPIs (cockpit) for a large hospital, which allows a quick monthly overview of the defined control parameters. Reporting is based on the International Business Communication Standard (IBCS, see https://www.ibcs.com). For example, KPIs on case numbers, outpatient services, economic and personnel data are displayed.

Supplement

To enable high-performance reporting in the dashboard, the data available in the BW system is prepared monthly (at the push of a button) for the cockpit (in versions). The data from more than 50 data pools (Info Cubes, classic and advanced data store objects = DSOs) is processed by 6 composite providers using one InfoSource and stored in 6 advanced DSOs. The data is formatted and structured using expert routines that are implemented in one and the same generic method of a central ABAP class created for this purpose.

Subject description

On the first page of the cockpit, the central KPIs – e.g. number of cases, case mix, DB II, personnel costs, productivity, evaluation deviations from InEK (Institut für das Entgelttsystem im Krankenhaus), outpatient services, etc. – are displayed. – The data is displayed in six groups using (rotatable) tiles. The presentation on the tiles is made with percentage changes to the plan or previous year or (rotated) with bar charts showing the values of the current and the three previous years. From each KPI group you can jump to a detailed page, which displays these and other KPIs in a more detailed form (time or structure) (bar chart, waterfall chart). You can jump from these detail pages to the existing reporting by taking parameters such as year and cost center with you.

IT project data

Project period18.06.2018 - 30.11.2018

Customers who trust us

Have we sparked your interest ?

Portrait Herr Knudsen, Mann im Anzug

Ole Knudsen

Key Account Manager

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.