Metering point operation without delivery of energy

Project duration: 1 year

Brief description

Mapping of the metering point operation in the master data system independently of existing contract structures. Due to the customer’s core business, the focus is on supplying energy to points of consumption. The new business model of the metering point operation should also be mapped independently of the energy supply as a separate business process.

Supplement

The customer’s master data application is based on a three-layer, service-oriented architecture (.Net-based thin client, application server, MS SQL 2008). The system communicates both with other individually implemented systems of the customer and with standard software such as SAP. The data exchange takes place with the help of various formats, primarily with the help of in-house XML formats, which are sent to a BizTalk server, which forwards the data in accordance with the relevant requirements. Development is performed in C# based on the .Net 3.5 framework.

Subject description

Following deregistration of the metering point operation, the network operator can obligate the current metering point operator to continue the metering point operation for up to three months beyond the actual date of deregistration. At present this scenario cannot be mapped by the application. Due to the close link between energy delivery and metering point operation, when the customer stops delivering energy the metering point operation must at present also be ended. Moreover, the metering point operation line of business should retain new customers in future, so that the new contract structures are also necessary for this scenario. An internal distinction will be made between metering points for energy supply and for energy feed-in. In future, metering point operation should be offered to end customers for this type of metering points and invoiced accordingly, regardless of the actual energy supply case or the mapping of the feed-in.

Overview

Project period01.07.2012 - 30.06.2013

Have we sparked your interest?

Dr. Andreas Schneider, grauhaariger Mann mit Brille

Dr. Andreas Schneider

Sector Manager Energy

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.