This is one of 4690 IT projects that we have successfully completed with our customers.

How can we support you?

Weißes Quadrat mit umrandeten Seiten rechts oben

Redesign of interface architecture for master data system

Project duration: 9 months

Brief description

To ensure the interface operation of the central master data application with the various external systems, the entire interface architecture is analysed and redesigned in light of the growing data volume and increasingly complex process requirements. The interface processes are controlled, monitored and documented via a central journal table. A total of nine different categories, each with 1-n different object types, are to be differentiated here.

Supplement

Due to the historical development, these have not yet been considered systematically and in a differentiated manner. For example, there is a lack of defined categories and object types, as well as scalable and dedicated data access and status transitions that can be used to control the necessary processing steps.

Subject description

In the first expansion stage, the categories and object types are defined and integrated into a separate data model. In addition, the entire access layer is ported to the new structure, thus ensuring a future-proof and scalable process. In the second expansion stage, the individual categories are transferred to separate control tables and the monolithic interface architecture is modularised with regard to both the data model and the processes.

Overview

Project period01.06.2022 - 01.03.2023

Have we sparked your interest?

Dr. Andreas Schneider, grauhaariger Mann mit Brille

Dr. Andreas Schneider

Head of Energy

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.