SAP ERP 6.0: Roll-in of a 4.6c production system

Project duration: 2 years, 7 months

Brief description

Replacement of an SAP 4.6c system at the production location. Inclusion in an SAP ERP 6.0 system with all production locations as a multi-site system. Conversion of all interfaces to existing systems.

Supplement

Main tasks: Interface definition and conversion, consulting, support for tests and coordination with other connected SAP systems. Required adjustment to processes and interfaces in associated systems.

Subject description

The local SAP systems of various production locations (DE, US, CH) are to be replaced with an ERP 6.0 multi-site system that reflects the global processes. Local considerations must be taken into account. The interfaces to associated SAP systems must be adapted and expanded, if necessary. Particular problems during testing, as parallel projects require the old interfaces to some extent due to conflicting go-live deadlines.

Overview

Project periodProjektzeitraum01.06.2013 - 31.12.2015

Have we sparked your interest?

Ole Knudsen

Key Account Manager

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.