
Wind power journal from 22.01.2025
The Electricity Price Brake Act required the Federal Network Agency, system operators, electricity supply companies, distribution and transmission system operators to establish all the necessary processes and interfaces using suitable StromPBG portals in order to ensure compliance with the statutory reporting obligations – including TransnetBW GmbH, which operates the electricity transmission grid in Baden-Württemberg. On top of this, it was a huge challenge to get the reporting portal live within a very short period of time and within an unalterable legal timeframe. TransnetBW succeeded with the IT and industry expertise of PTA IT-Beratung from Mannheim.

