IT project database

Weißes Quadrat mit umrandeten Seiten rechts oben

Convince yourself of the range of our IT consulting services and our unique expertise, which we make transparent for you with our IT project database. With the help of filters and keyword searches, you can search through 4798 IT projects that we have successfully completed with our customers.

The aim of the project is to introduce the digital platform CerQlar for certificate management and the automated allocation of Guarantees of Origin (GoO) and other Energy Attribute Certificates (EACs) as well …
The existing intranet application for company-wide maintenance and monitoring of IT system access is being expanded to include a technical function for blocking the activation of user accounts. This situation can arise …
An IT system for supporting recurring dosimeter checks is being transferred to modernized hardware. This change ensures the continued safe operation of the testing and configuration system in the current environment. It …
Additional automated data transfer mechanisms are to be established between the customer's personnel data management systems and those of its parent company. The aim of the work is to efficiently ensure that …
Creating configuration guides for the Endur application using AI prompting based on business requirements. …
Migration of the source code of an application for supporting the billing of energy industry surcharges from the Git repository of PTA GmbH into the customer's GitLab system. …
To replace a legacy system, PTA GmbH developed various implementation scenarios in a preparatory project phase and prepared them for decision-making by the IT and specialist departments based on technical and economic …
The customer plans to implement a new IT system for inventorying tools and work equipment in several of its electrical engineering and mechanical engineering departments. In addition to ensuring traceable storage of …
The aim of the project is to introduce automated testing as part of the simultaneous development of a B2C platform. To this end, PTA is conducting a proof of concept (PoC). The …
The Low Voltage Cockpit (NSC) is a software tool for monitoring and automated control of low voltage networks in accordance with the legal requirements of the Energy Industry Act (EnWG). The aim …
The amendment to the Energy Industry Act (EnWG) of February 2025 stipulates, according to Section 12, Paragraph 2b of the EnWG, that a so-called controllability check must be conducted annually by the …
This project implements an automated data pipeline for extracting, storing, and visualizing web data. Open and closed source data is scraped, stored in Snowflake, and interactively visualized. The solution enables scalable and …
A version update of the central authentication system based on biometric data will change existing access mechanisms in order to make managed user information accessible to other central systems within the company …
In preparation for the introduction of Windows 11 and Office 365, managed individual software systems are being checked for compatibility with the new environment. This affects more than 30 IT applications based …
An existing intranet system for handling and providing information on the business depreciation of fuel elements is to be used as a pure information system for historical data after its active use …
This project aims to improve the product. To this end, a new sales process must be defined that incorporates the new product features and supports sales, processing, and billing. Several companies within …
The existing intranet application for managing and issuing tools (project number 6183) will be expanded with functional and technical optimizations after an initial productive usage phase. This will integrate the option of …
For optimizing the communication paths between business and IT and to ensure effective definition, documentation, steering and implementation of requirements we have developed a requirements management process together with our client. …
Support and further development of a large number of existing IT applications for the administration of a power plant in the area of individual software development. The applications in the form of …
The project targets to support the product owner in developing an internal web application in context of energy trading. The focus is on analysing technical requirements, maintaining the product backlog and supporting …
Support and further development of individual software for solving mixed integer optimization problems in the energy sector. The support will free up internal resources and give them room for an evaluation of …
The aim of the project is to design, develop and integrate a scalable B2B solution that enables the automated exchange of business data and transactions between partner companies. The solution should increase …
As part of the end of support from Microsoft for .NET 6, all productive applications that are still on .NET 6 will be converted to the LTS version (Long Term Support) .NET …
The customer is migrating a large number of data streams that previously ran via Kafka on HDInsight to the Confluent Cloud platform. At the same time, a number of optimizations and refactoring …

Have we sparked your interest?

Dr. Frank Gredel, ein Mann mit braunen Haaren

Dr. Frank Gredel

Head of Business Development

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.