Calculation system expansion

Project duration: 5 months

Brief description

Expanding a complex calculation system for constructing power plants and converting it to a new version of the development tool used.

Supplement

Adjusting the calculation logic to the new calculation procedure, optimizing the basic mathematical functions for bottom up and top down calculation with multiple unknowns, converting MS Access 2.0 to MS Access 97, internationalization, interface with Oracle (central costs database) and MS Access for decentralized processing.

Overview

Project period01.01.2000 - 01.06.2000