Controlling loading points for tanker trucks

Project duration: 5 months

Brief description

Optimizing the utilization of various loading points for tanker vehicles, taking the times of arrival at the target destination into account.

Supplement

Data is entered into a host system and evaluated in a batch run at night. After the batch run is complete, the results can be printed out as a list. The system is implemented in COBOL and the data is stored in a DB2 database.

Subject description

The utilization of the loading points for tanker trucks is to be automatically optimized in line with specified calculation rules.

Overview

Project period01.08.1999 - 31.12.1999