IT-technical support of a planning system for power plant decommissioning (2023)

Project duration: 1 year

Brief description

The task concerns the ongoing IT support of an intranet application for the planning of a power plant decommissioning. It includes minor optimizations and conceptions of technical enhancements of the system in close coordination with the department concerned. As a result of modernization work, the end-user application consists of two independent intranet applications based on the technologies .NET 4.8 and ASP MVC5 as well as .NET 6 and ASP MVC Core, which use a common database. Synchronization mechanisms exist between the application components to avoid business or technical inconsistencies.

Supplement

The activities of PTA concern the technical support of the intranet application components as well as the complex database functionalities for the reconciliation of the data stock with the upstream system Mesa4PC. Essential conceptual work serves to prepare further migration steps of the overall system to .NET 6 / ASP MVC Core. To validate the feasibility of functional requirements and their technical implementation, various prototypes / proof of concepts are being worked on in close coordination with the business unit.

Subject description

The benefit for the department is the ability to address business and technical challenges, as well as to coordinate and reliably evaluate preliminary planning for larger expansion requirements.

Overview

Project period01.01.2023 - 31.12.2023