Preliminary study for SAP R/2 RK-S

Project duration: 3 months

Brief description

Carrying out a preliminary study to prepare for the introduction of cost-center accounting based on SAP R/2 RK-S.

Supplement

The aim is to replace a legacy system that is based on a highly modified version of a Ratioplan cost accounting system. To prepare for the target conceptual design, the actual processes are recorded and documented.

Subject description

A new cost accounting concept is to be developed in line with the functions of the RK modules in SAP R/2.

Overview

Project period01.04.1995 - 30.06.1995