This is one of 4544 IT projects that we have successfully completed with our customers.

How can we support you?

Waste water information system

Project duration: 13 years, 3 months

Brief description

Development of an information system for monitoring waste water based on a database supplied with data from gauging stations in sewage ducts. The information system will be continuously developed because the individual legal provisions of environmental agencies must be taken into consideration.

Supplement

The project covers functional and data processing design, implementation using Oracle tools, tests as well as the implementation of the application and the creation of manuals. Data from measuring equipment is transferred to the database as text strings via an SQL loader.

Subject description

For waste waters in chemical production, a distinction is drawn between waste water that does not require treatment and waster water that does require treatment, and which much be monitored.

Overview

Project period01.01.1988 - 31.03.2001

Have we sparked your interest?

Ole Knudsen

Key Account Manager

Jetzt Kontakt aufnehmen

Contact now

Download file